Area is dug out to a minimum depth of 10". |
||
A 20mm washed-clean limestone sub-base is added to a depth of 150mm. |
||
Sub-base completed with vibrating plate |
||
A geo-textile membrane is overlaid to allow water through and prevent weed growth |
||
A 2mm - 5mm washed-clean limestone base is added. |
||
Block paving is installed |
||
Joints are filled with 2mm-5mm washed-clean limestone. |
||